深夜爽爽动态图无遮无挡,日本激情一区二区三区,波多野结衣三级在线播放,国产精品剧情对白无套在线观看,国产精品久久777,国产h在线播放,麻豆tv在线观看入口,91色在线
Welcome,Flow Switches,Shanghai ZanKe Automation Technology Co., Ltd Hotline:18001874240
Language: Chinese∷  English

Home> English Website common problem

Turbine flowmeter installation precautions

Time: 2020-02-20 12:02:50 Click:0
Turbine flowmeter installation precautions is following:

(1) Installation site
The turbine flowmeter sensor should be installed in a place where maintenance is easy, and the pipeline is free from vibration, strong magnetic interference and heat radiation. When installed outdoors, there should be measures to avoid direct sunlight and rain.
(2) Installation requirements and precautions
The sensor installed horizontally of the turbine flowmeter requires that the pipeline should have no observable tilt (within 5 deg;). The vertical deviation of the sensor installed vertically should be less than 5 deg;, and the fluid direction should be downward and upward.
Where the flow cannot be stopped, bypass and stop valves should be installed.
If the fluid contains impurities, a filter should be installed on the upstream side; if it contains gas, a deaerator should be installed on the upstream side. The drain and air outlet of the filter and the air cleaner should lead to a safe place.
The flow regulating valve should be installed downstream of the sensor, and the upstream shut-off valve should be fully opened during measurement, and must not cause vibration and external leakage. For processes that may produce reverse flow, check valves should be added to prevent reverse flow of fluid.
The sensor should be concentric with the pipeline, and the sealing gasket must not protrude into the pipeline. The sensor should no longer be at the high point of the pipeline, so as to prevent the gas accumulated in the pipeline (such as air mixed in when the flow is stopped) staying at the sensor, which is difficult to discharge and affect the measurement.
The pipes at the front and rear of the sensor should be supported firmly without vibration. For condensable fluids, heat insulation measures should be taken for the sensor and its front and rear pipes.
Transmission cables are usually two-core or three-core with shielded signal cables. The shielded signal cables should be grounded at the end of the display instrument (flow totalizer or flow calculation controller). The transmission path should not be parallel to the power supply line. Area where lines are concentrated.
Turbine flowmeter installation precautions
Article from:yibiaohui

TheTurbine flowmeter is one of the main products of the NOIKE. For more information, please visit the product page orZANKE staff.
主站蜘蛛池模板: 保定市| 济阳县| 忻州市| 崇信县| 大英县| 奎屯市| 正定县| 昌都县| 淮滨县| 新巴尔虎左旗| 香河县| 筠连县| 镇平县| 永宁县| 罗定市| 喀什市| 长海县| 页游| 巴楚县| 甘孜县| 武功县| 高邮市| 大化| 上虞市| 长葛市| 新蔡县| 凤冈县| 恩施市| 崇左市| 固阳县| 清远市| 珲春市| 莱阳市| 乃东县| 襄城县| 白水县| 潼南县| 灌阳县| 原平市| 靖远县| 兴业县| 乌鲁木齐市| 酒泉市| 阳原县| 伊宁县| 高雄县| 清水河县| 睢宁县| 阿克| 宁陵县| 云霄县| 甘孜县| 十堰市| 依兰县| 巨鹿县| 樟树市| 新津县| 东辽县| 马山县| 维西| 湟中县| 漯河市| 漯河市| 富顺县| 宜川县| 遂川县| 凌源市| 友谊县| 南和县| 乐东| 澳门| 新巴尔虎右旗| 张家界市| 西充县| 永嘉县| 福鼎市| 泊头市| 泰兴市| 安仁县| 嘉兴市| 美姑县| 罗江县|