深夜爽爽动态图无遮无挡,日本激情一区二区三区,波多野结衣三级在线播放,国产精品剧情对白无套在线观看,国产精品久久777,国产h在线播放,麻豆tv在线观看入口,91色在线
Welcome,Flow Switches,Shanghai ZanKe Automation Technology Co., Ltd Hotline:18001874240
Language: Chinese∷  English

Home> English Website news

Detailed Installation Steps for Smart Water Valve Controllers?

Time: 2025-08-22 10:08:54 Click:0

Detailed Installation Steps for Smart Water Valve Controllers?

I. Basic Installation Procedure?


Preparatory Work?


Turn off the main water supply and drain residual pressure from the pipes.

Verify that the valve model matches the pipe size (e.g., DN20, DN25) and confirm all accessories (seals, flange bolts, etc.) are included.


Pipe Connection?


Threaded Connection?: Wrap Teflon tape (≥15 turns) on the pipe threads, align with the valve inlet, and tighten clockwise by hand before securing with a wrench (final tightening should not exceed ? turn).

Flange Connection?: Align flanges and tighten bolts diagonally in stages (final torque deviation ≤25%). High-temperature pipes require expansion joints.

Welded Connection?: Grind welding bevels flat; ensure proper insertion depth for socket welding.


Electrical Wiring?


Connect the electric valve to a 220V power supply (recommended as an independent circuit). Shielded signal lines (e.g., RS485) must be grounded at one end.

Configure the smart controller’s Wi-Fi module (e.g., Alarm.com or Qolsys) as per the manual.


Functional Testing?


Gradually open the water supply, check for leaks, then power on the system. Test remote control, flow adjustment, and leak detection functions.

II. Installation Guidelines by Scenario?


Residential Applications?


Install in concealed areas (e.g., above suspended ceilings or inside cabinets), leaving ≥500mm of working space.

Retrofit inlet pipes using PPR ball valves and laser-align holes (tolerance ≤3mm).


Agricultural Irrigation?


Lay main pipes according to slope; space drip tapes 30–50cm apart. Install filters and backflow preventers at the headworks.


Industrial Applications?


Use explosion-proof actuators (Ex d IIC T6 rated) and ensure valve grounding resistance ≤4Ω.

III. Troubleshooting Common Issues?


Valve Leakage?


Cause?: Damaged sealing surfaces or loose bolts.

Solution?: Replace seals/gaskets and evenly re-tighten bolts.


Communication Failure?


Cause?: Incorrect RS485 wiring or interference.

Solution?: Confirm A/B line polarity and ground the shield at one end.

IV. Key Considerations?

Perform a 1.5× working pressure seal test after installation, holding for 30 minutes with no pressure drop.

Clean filters regularly (quarterly for agriculture, semi-annually for industry) and validate valve travel.

Confirm the default valve state (fail-open/fail-closed) during power outages to prevent system failures.


Note?: For complex installations, consult the product manual or contact a professional.


主站蜘蛛池模板: 三河市| 交口县| 左权县| 孟州市| 平谷区| 交口县| 眉山市| 铜山县| 普洱| 思南县| 洪泽县| 聊城市| 阿勒泰市| 东平县| 郸城县| 颍上县| 泾川县| 周宁县| 嫩江县| 淮北市| 南漳县| 勃利县| 阜城县| 仁化县| 闸北区| 兰西县| 林西县| 丹凤县| 集贤县| 凤冈县| 西昌市| 界首市| 巴里| 海南省| 吐鲁番市| 英山县| 双柏县| 霍城县| 左贡县| 贵港市| 邵阳市| 太谷县| 政和县| 玉溪市| 福安市| 汉川市| 修水县| 吴堡县| 湖州市| 连江县| 偃师市| 上林县| 武胜县| 石泉县| 十堰市| 乐都县| 渭南市| 高雄县| 曲麻莱县| 湟源县| 五河县| 贵阳市| 永修县| 红安县| 北海市| 喜德县| 中牟县| 咸宁市| 横峰县| 绩溪县| 高州市| 临邑县| 镇赉县| 乾安县| 彩票| 江孜县| 湘阴县| 新闻| 山丹县| 河源市| 筠连县| 古浪县|