Professional Installation Guide for NFS22 Series Mechanical Flow Switches?

Time: 2025-07-25 05:07:06 Click:0

Here is the professional English translation of the NFS22 Series Mechanical Flow Switch installation guide:


Professional Installation Guide for NFS22 Series Mechanical Flow Switches?


I. Pre-Installation Preparation?

Pipe Section Selection?


Select horizontal or vertically upward-flowing straight pipe sections (inverted installation PROHIBITED)

Ensure upstream/downstream straight pipe sections ≥5× pipe diameter; avoid turbulence sources (elbows, valves, etc.)

Clean pipeline interior to prevent paddle obstruction


Flow Direction Calibration?


Confirm medium flow direction strictly matches the arrow indicator on the switch housing


II. Mechanical Installation Procedure?

Threaded Connection? (DN20/DN25 interfaces)


Wrap PTFE thread seal tape or apply sealant to external pipe threads

Hand-tighten the switch into pipe internal threads, then secure with a wrench for additional 1/4 turn (AVOID over-tightening to prevent housing deformation)


Paddle Positioning?


Paddle axis must be parallel to pipeline centerline

Adjust insertion depth to ensure paddle remains suspended without contacting pipe walls/throttling elements


III. Electrical Wiring Specifications?

Safety Operations?


Disconnect power and verify de-energization before wiring

Use ONLY designated equipment grounding terminal for grounding


Terminal Functions?


Terminal Function Wire Color Example

COM Common Terminal Yellow/Grey

NO Normally Open (flow ON) White/Orange

NC Normally Closed (flow OFF) Black/Blue


? Wiring Example?:

Flow Protection: NO terminal → Equipment start/stop control circuit, COM terminal → Power supply positive


IV. Commissioning & Verification?

Flow Setting?


Rotate adjustment knob clockwise to increase trigger flow, counterclockwise to decrease (accuracy: ±2%)

Recommended setting range for fire protection systems: 1~3.5L/s


Functional Testing?


No-flow Test?: When flow drops below 10% of setpoint, NC contacts should CLOSE

Full-flow Test?: When flow reaches setpoint, NO contacts must OPEN immediately (pressure loss ≤0.01bar)


V. Prohibited Actions? ??


DO NOT install inverted or with paddle contacting pipe walls

NEVER wire under power or adjust non-calibration screws

AVOID installation near vibration sources (pumps/compressors)


Note: For hydraulic systems, post-installation testing must evaluate lubricating oil film's impact on paddle sensitivity.


(This translation preserves all technical specifications, safety protocols, and industry terminology from the original Chinese documentation.)


主站蜘蛛池模板: 苍山县| 宁国市| 平陆县| 临湘市| 福建省| 荆门市| 宁陕县| 西青区| 恩平市| 资兴市| 伊通| 红河县| 平顶山市| 宣汉县| 韶关市| 惠州市| 资溪县| 库尔勒市| 八宿县| 合川市| 中卫市| 安龙县| 宁乡县| 棋牌| 嵊州市| 蒲江县| 建湖县| 富阳市| 龙陵县| 丽水市| 菏泽市| 饶河县| 泰兴市| 万荣县| 芦山县| 甘肃省| 两当县| 肃宁县| 福州市| 天气| 中江县| 惠东县| 高安市| 青浦区| 合阳县| 个旧市| 伊金霍洛旗| 沁水县| 江阴市| 穆棱市| 双江| 都兰县| 揭东县| 江门市| 金阳县| 西昌市| 延川县| 巴里| 中西区| 祁阳县| 祁门县| 武义县| 洪洞县| 浠水县| 凉山| 景东| 珠海市| 温宿县| 托克逊县| 芜湖市| 米易县| 开原市| 大洼县| 凌海市| 新蔡县| 大悟县| 泊头市| 通州市| 黄骅市| 广水市| 平顶山市| 都安|