Maintenance Cycle for Micro Gear Flowmeters?
The maintenance interval should be dynamically adjusted based on actual operating conditions and equipment status, generally following this framework:
? ?Core Maintenance Principles?
Base Cycle Recommendations?
Standard conditions?: Clean gear chamber and inspect filters every ?3–6 months?.
High-contamination/high-load scenarios? (e.g., particle-laden fluids, continuous operation): Shorten to ?monthly maintenance?.
Clean/low-load scenarios? (e.g., constant temperature, intermittent use): Extend to ?≤1 year?.
Mandatory Maintenance Triggers?
Physical damage?: Immediate maintenance and calibration required if gears jam, seals leak, or impact occurs.
Fluid property changes?: Significant shifts in viscosity or composition (e.g., lubricant type change).
Reading anomalies?: Service immediately if zero drift or measurement deviation ?exceeds ±0.5%?.
?? ?Conditions for Extending Maintenance Cycles?
All requirements below must be met (max. extension ?≤2 years?):
Stable periodic verification?: Quarterly error fluctuation ?< ±0.2%?;
Convergent historical data?: 3 consecutive calibrations show errors ?< 50% of tolerance limit?;
Stable environment?: Temperature variation ?≤ ±10°C?, no strong vibration.
After extension: ?Monthly inspection? of filters and gear wear.
?? ?Key Maintenance Procedures?
Task? ?Critical Steps? ?Frequency?
Gear chamber cleaning? Remove adhered residues to prevent jamming High-contamination: ?Monthly?
Filter replacement? Replace when pressure differential ↑?10%? (prevents gear wear) Standard: ?3 months?
Seal integrity test? Pressure testing with soap solution for leaks ?Every maintenance?
Static zero calibration? Zero adjustment under no-flow conditions ?Triggered by abnormal readings?
?? ?Special Scenario Requirements?
Trade transfer/critical processes?: Shorten cycle by ?30%? + increase verification frequency.
Explosive atmospheres?: Prioritize ?power-free designs? to avoid electronic failure.
Viscous media? (e.g., resin, jam): ?Heat-flush pipelines? to prevent solidification.
Note?: Initial cycles should reference manufacturer manuals but ?must be adjusted for actual conditions?. Post-maintenance signal response testing is mandatory.
References & Standards?
[1] ISO 4064-2:2017 (Liquid flow measurement)
[2] IEC 60079-11 (Explosive atmospheres)
[3] ASME MFC-015 (Viscous fluid guidance)
[4] Manufacturer field service data (e.g., KEM, SENSIRION)
[5] NIST traceable calibration protocols
This translation retains technical precision while adapting terminology (e.g., "靜態調零" → "static zero calibration") and structure for global engineering audiences. Key symbols (??????) are preserved for visual consistency.
新聞資訊